BUYER RFQ CHECKLIST
OCTG RFQ Checklist
A complete OCTG enquiry reduces clarification time and helps buyers compare offers on the same technical, inspection and delivery basis.
Product schedule
List casing and tubing separately and define each line item completely.
- Product, size and nominal mass
- Grade, range and quantity
- Connection and end condition
- Couplings, pup joints and accessories
Operating and service conditions
Identify conditions that may alter material, connection, testing or acceptance requirements.
- Well type and string function
- Pressure and temperature envelope
- H₂S, CO₂ and produced-fluid information
- Special collapse, corrosion or low-temperature needs
Quality and documents
State the evidence required with the quotation and final shipment.
- MTC type and traceability
- NDT, hydrotest and supplementary tests
- Third-party inspection points
- Final manufacturing record dossier
Commercial delivery basis
Logistics inputs affect packing, protection, lead time and quotation comparability.
- Required delivery date or sequence
- Destination country, port and Incoterm
- Marking and packing instruction
- Shipment or storage limitations
ENQUIRY CHECKLIST
Information to prepare.
Use this list as an initial procurement guide. The governing design and purchase documents remain authoritative.
Send Your Requirement- 01Separate line-item schedule for casing and tubing
- 02Standard and purchaser specification with edition
- 03Size, mass, grade, connection, range and quantity
- 04Service conditions and performance requirements
- 05Inspection, testing and documentation list
- 06Destination, Incoterm, schedule and packing
